The Ohio Dept. of Transportation (ODOT), www.dot.state.oh.us, Columbus, Ohio, has contracted with architecture, engineering, and geospatial services provider Woolpert, www.woolpert.com, Dayton, Ohio, to prepare full-scale design plans for the renovation of the State Route 513 bridge over Interstate 70 in Guernsey County.

Woolpert will replace the superstructure of the bridge, which is categorized by the state as requiring a complex level of bridge design. The bridge’s geometry includes horizontal and vertical curves, skew, dog-leg beams and superelevation.

Preliminary and final design will use LiDAR (light detection and ranging) provided by ODOT and supplemented by Woolpert. The renovation will include replacing the bridge deck and abutments, and elevating the vertical clearance on I-70 to accommodate the increase in oversize vehicles and interstate commercial traffic.

“We’ll need to raise the lowest portion about 9 inches,” explains Woolpert Project Manager Ron Mattox. “The bridge is on a curve, so one side is higher than the other. We’ll use higher-strength steel and a more refined analysis to get that required clearance.”

Mattox relates that ODOT prefers a minimum vertical clearance of 16 feet, 6 inches, which is above the national minimum of 16 feet. He indicates SR 513 and I-70 are expected to remain open during the reconstruction process. Construction is expected to begin in October 2017.

“Operationally, the bridge will be the same as it is now, and most people driving over it won’t even notice a difference,” Mattox says. “But it will be higher relative to the interstate below and therefore safer.”

Want to tweet about this article? Use hashtags #construction, #technology, #ODOT, #engineering